preview
- A preview of the project to establish a sewage station on Bain Al-Ezbatin Street in the Helwan District
- Preview of the Agricultural Resort project in Nasiriyah
- Inspecting the cause of the water leak and closing the causing water source from section No. 3, Block 15/48, 3rd Tourist, on section No. 4, Block 15/48, 3rd Tourist.
- Inspection of residential buildings - section No. 35, Al-Andalus Sector, Cairo, Al-Gedda.
- Inspection of Residential Unit No. (3), Building (60), Area (18), District 11, 6th of October.
- Inspection of a water leak in the basement of 5 elevators in the Supreme Constitutional Court.
- Inspecting the presence of water in the elevator wells of Sheikh Zayed Al Nahyan Hospital in Nasr City.